Rss   Email Alert
Probabilistic Dynamic Assessment for Operating Reserve Requirements of Power System with High Penetrated Renewables
WU Sijia, CHI Fangde, YE Xi, KUANG Li, WANG Ze, WEN Yunfeng
ELECTRIC POWER CONSTRUCTION . 2023, (6): 126 -134 .  DOI: 10.12204/j.issn.1000-7229.2023.06.013