[1]凌平,金珩,钱之银.提高输电线路输送容量动态监测增容技术的研究[J].中国电力,2007,40(1):44-47.
Ling Ping, Jin Heng, Qian Zhi-yin. Research on improving the transmitting capacity of transmission line based on dynamic monitoring[J].Electric Power,2007,40(1):44-47.
[2]彭向阳,周华敏,郑晓光,等.架空送电线路特殊增容运行研究[J].中国电力,2010,43(1):40-42.
Peng Xian-gyang, Zhou Hua-min, Zheng Xiao-guang,et al.Study on raising transmission capability of overhead transmission line in special operation condition[J].Electric Power,2010,43(1):40-42.
[3]吕泽承,邓雨荣,张炜,等.基于IEC 61850标准的在线监测综合处理单元与主站平台通信技术[J]南方电网技术,2013,7(6):36-40.
Lü Zecheng, Deng Yurong, Zhang Wei,et al. The technology on communication between integrated processing unit of online monitoring system and master station platform online monitoring system based on IEC 61850 [J]. Southern Power System Technology, 2013,7(6):36-40.
[4]凌平,黄华.变电设备动态增容方案设计研究[J].华东电力,2011,39(11):1799-1802.
Ling Ping,Huang Hua. Research on variable dynamic capacity plan design of electric equipments[J]. East China Electric Power,2011,39(11):1799-1802.
[5]张燕.浅谈变压器增容改造及应用[J].科技资讯,2007(3):50-50.
[6]朱卓城.基于变配电房增容改造的变压器选配及经济运行[J].电力需求侧管理,2010,13(1):57-58.
Zhu Zhuocheng. Transformer selection and economic operation based on transformation and distribution room uprating reconstruction[J]. Power Demand Side Management, 2010,13(1):57-58.
[7]李运德.变电所增容对主变压器的选择[J].农村电工,2005,13(2):28-28.
[8]刘永波,向小民,范开明.计及经济效益的系统主变压器节能增容改造分析研究[J]. 陕西电力,2012,40(9):51-53.
Liu Yongbo, Xiang Xiaoming, Fan Kaiming. Analysis and research on energy saving and capacity increase reform of system main transformer considering economic benefits[J]. Shaanxi Electric Power, 2012,40(9):51-53
[9]江淘莎,李剑,陈伟根,等.油浸式变压器绕组热点温度计算的热路模型[J].高电压技术,2009,35(7):1635-1640.
Jiang Taosha, Li Jian, Chen Weigen, et al. Thermal model for hot spot temperature calculation in oil-immersed transformers[J]. High Voltage Engineering, 2009, 35(7):1365-1640.
[10]范闻博,韩筛根.有载调容变压器安全经济运行控制策略[J].电力系统自动化,2011, 35(18):98-107.
Fan Wenbo, Han Shaigen. A control strategy for secure and economic operation of on-load capacity regulating transformer[J]. Automation of Electric Power System, 2011, 35(18):98-107.
[11]谢幸生.变压器增容加固改造概论[J].高电压技术,2004,30(136):120-123.
Xie Xingsheng. Summerization on power transformer’s reconstruction involving increasing capacity and being reinforced[J]. High Voltage Engineering, 30(136):120-123. |