Pipe Construction of Balance of 1 000 MW Pressurized Water Reactor Nuclear Power Plant

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (7) : 120-123.

PDF(380 KB)
PDF(380 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (7) : 120-123.

Pipe Construction of Balance of 1 000 MW Pressurized Water Reactor Nuclear Power Plant

Author information +
History +

Abstract

The technical problems, such as the traceability of the construction quality, anti-deformation of shared support, clean control inside the electro-polished tube, and applications of groove pipes, are discussed in this paper, which occur in the pipe construction of balance of nuclear power plant. Furthermore, the corresponding technical measures are established combining with the practical condition, which are proved to be simple and effective by the on-site inspection, providing references for the pipeline construction of balance of nuclear power plant in the future.

Key words

pressurized water reactor nuclear power plant / supporting facilities / pipeline construction / electro-polished tube / groove pipe / tightening torque

Cite this article

Download Citations
Pipe Construction of Balance of 1 000 MW Pressurized Water Reactor Nuclear Power Plant[J]. Electric Power Construction. 2011, 32(7): 120-123
PDF(380 KB)

Accesses

Citation

Detail

Sections
Recommended

/