Measures for AC Filters Abnormally Connecting Problems in ±800 kV UHVDC Project from Jinping to Sunan

JIA Xuantao,YAN Bing,ZHANG Ailing1,YAO Jinbo,WU Baosheng

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (3) : 92-97.

PDF(752 KB)
PDF(752 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (3) : 92-97.

Measures for AC Filters Abnormally Connecting Problems in ±800 kV UHVDC Project from Jinping to Sunan

  • JIA Xuantao1,YAN Bing1,ZHANG Ailing1,YAO Jinbo2,WU Baosheng2
Author information +
History +

Abstract

During the charging test on pole 1 lower-voltage converter transformer in Tongli Station of ±800 kV UHVDC project from Jinping to Sunan, when the reactive power control system gave a filter input command as converter transformer charging, twelve groups of AC filters in hot standby state were connected one by one. Then an over-voltage protection trip occurred at AC busbar, but the control system was automatically input again. The reason is that the voltage of 500 kV AC busbar used for reactive power control is less than the setting value of low voltage monitoring for Ac system (Umax), so the reactive power control continue gives a command to input filter. The above problems caused by measurement circuit fault are solved by adding the low-voltage limited function, and the interlock function is added in AC filter control program, in order to prohibit the AC filter connecting again when it is disconnected while its discharge is not finished. The tests on site prove the change of software is correct and reliable.

Key words

UHVDC power transmission / reactive power control / AC filter / low voltage monitoring for AC system / circuit breaker locked / low-voltage limited

Cite this article

Download Citations
JIA Xuantao,YAN Bing,ZHANG Ailing1,YAO Jinbo,WU Baosheng. Measures for AC Filters Abnormally Connecting Problems in ±800 kV UHVDC Project from Jinping to Sunan[J]. Electric Power Construction. 2013, 34(3): 92-97

References

[1]张啸虎, 曹国云,陈陈. 高压直流系统低功率运行时的无功控制策略[J]. 电网技术,2012,36(1): 118-122.



[2]戴国安,周君文,王亚非.特高压直流无功控制策略研究[J].电力系统保护与控制,2008,36(14):48-51.



[3]张望,郝俊芳,曹森,等.直流输电换流站无功功率控制功能设计[J].电力系统保护与控制,2009,37(14):72-76.



[4]刘耀,王明新. 高压直流输电系统保护装置冗余配置的可靠性分析[J].电网技术,2008,32(5):51-54.



[5]石岩,张民,赵大平.特高压直流工程二次系统成套设计方案及其特点[J].电网技术,2008,32(21):1-5.



[6]李延龙,杨亚璞,李楠.高压直流输电控制保护系统的冗余可靠性研究[J].电力系统保护与控制,2009,37(16):59-62.



[7]张望,黄利军,郝俊芳,等.高压直流输电控制保护系统的冗余设计[J].电力系统保护与控制,2009,37(13):88-91.



[8]王徭.特高压直流输电控制与保护技术的研究[J].电力系统保护与控制,2009,37(15):53-58.



[9]罗宇航,张振华,张文,等.云广直流系统交流滤波器保护误动作分析及改进措施[J].电力系统保护与控制,2011,39(3):137-140.



[10]蔡希鹏. ±500 kV天广直流输电系统交流滤波器频繁投切分析[J]. 电网技术,2005, 29 (4): 1-3.



[11]杨万开,曾南超,王明新,等.三峡至广东直流输电工程系统调试关键技术[J].中国电力,2008,41(1):40-43.