Technical and Economic Analysis of 500 kV Main Electrical Connection Scheme in Suzhou 1 000 kV UHV Substation

WANG Hao, WANG Zhan, CHEN Bin

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (4) : 43-46.

PDF(542 KB)
PDF(542 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (4) : 43-46.

Technical and Economic Analysis of 500 kV Main Electrical Connection Scheme in Suzhou 1 000 kV UHV Substation

  • WANG Hao, WANG Zhan1, CHEN Bin 2
Author information +
History +

Abstract

With the rapid development of UHV power grid, the main electrical connection of UHV substation becomes more and more important to the safe and reliable operation of power grid. Therefore, the selection of suitable main electrical connection is a key work in the construction of UHV substations. According to the characteristics of Suzhou 1 000 kV UHV substation, he 500 kV main electrical connection scheme is analyzed in this paper. The techno-economic comparison between double-bus connection and two-thirds connection is carried out and the 500 kV main electrical connection of Suzhou UHV substation is suggested to adopt the double-bus connection, which not only could meet the requirements of the reliability of power grid, but also have some advantages of flexible scheduling, convenient expansion, small occupation of land and low investment.

Key words

UHV substation / main electrical connection / reliability / double-bus connection / two-thirds connection

Cite this article

Download Citations
WANG Hao, WANG Zhan, CHEN Bin. Technical and Economic Analysis of 500 kV Main Electrical Connection Scheme in Suzhou 1 000 kV UHV Substation[J]. Electric Power Construction. 2013, 34(4): 43-46

References

[1]GB 50697—2011 1 000  kV变电站设计规范[S]. 北京:中国计划出版社,2011.



[2]李勇,黄宝莹,鲁宗相,等. 基于电网协调发展的特高压变电站电气主接线设计原则[J]. 电力建设,2011,32(1): 27-33.



[3]国家电网公司. 国家电网总体规划设计[R].北京:国家电网公司, 2009.



[4]中国电力工程顾问集团、国网北京经济技术研究院.淮南—南京—上海1 000  kV交流输变电工程可行性研究[R].北京:中国电力工程顾

 


问集团、国网北京经济技术研究院, 2010.



[5]Billinton R,  Chen H, Zhou J Q, Individual Generating Station Reliability Assessment[J], IEEE Transaction on Power

 


System, 1999,14(12):4



[6]Billinton R, Ronald N. Allan, Reliability Evaluation of Power System (second edition)[M], Plenum Press, 1994.



[7]Billinton R, Ronald N. Allan, Reliability Evaluation of Engineering System: Concepts and Techniques[M]. Pitman Press,

 


1983.



[8]郭永基.苏联若干电工产品可靠性指标统计[J]. 电工技术,1989(3):8-13.



[9]CIGRE WG13.06. Studies on the Reliability of Single Pressure SF6-Gas High-voltage Circuit Breakers[S]. 1996.



[10]CAE. Forced Outage Performance of Transmission Equipment[S]. 1996.



[11]鲁宗相,郭永基.水电站电气主接线可靠性评估[J].电力系统自动化,2001,25(18):16-19.



[12]中国电工技术学会特高压输变电技术考察团. 俄罗斯、乌克兰超、特高压输变电技术发展近况[J]. 电力设备,2003,4(2):49-56.