[1]林诚格,郁祖盛,欧阳予,等. 非能动安全先进核电厂AP1000[M]. 北京:原子能出版社, 2008:375-379. [2]Westinghouse Electric Company LLC. APP-GW-J4-031 AP1000 interface specification for non-class 1E AC switchgear controlled motors[R]. Pittsburgh, PA: Westinghouse Electric Company LLC, 2009. [3]Westinghouse Electric Company LLC. CPP-GW-J4-033 CPP DCIS vendor pack and bus interface guide[R]. Pittsburgh, PA: Westinghouse Electric Company LLC, 2009. [4]国核电力规划设计研究院. HYG-G6-J4-112 non-standard J4 for non-1E AC SWG controlled motor[R]. 北京: 国核电力规划设计研究院. 2009. [5]DL/T 1083—2008 火力发电厂分散控制系统技术条件[S]. 北京:中国电力出版社,2008. [6]唐红键, 谭茂强. 大容量高压电动机变频器继电保护对策探讨[J].电力建设,2010,31(5):81-85. [7]Westinghouse Electric Company LLC. APP-PLS-J4-010 AP1000 ovation interface design specification[R]. Pittsburgh, PA: Westinghouse Electric Company LLC, 2009. [8]曹幸卫,吕静,姜世凯. 发电厂厂用电动机的过电压及其防护[J].电力建设,2005,26(12):3-5. [9]Westinghouse Electric Company LLC. HYG-PLS-J4-107 Haiyang China AP1000 Plant control system modbus configuration specification for ovation[R]. Pittsburgh, PA: Westinghouse Electric Company LLC, 2010. [10]兀鹏越,张文斌,赵炳忠,等. 利用电动机启动电流检验差动保护接线的新方法[J].电力建设,2007,28(9):5-8. |