Technical Scheme of ‘Combining Two into One’ Retrofit forInduced Draft Fan and Booster Fan of 600 MW Units
CHENG Yongxin,CHEN Yong
ELECTRIC POWER CONSTRUCTION . 2013, (9): 96 -101 .  DOI: 10.3969/j.issn.1000-7229.2013.09.019