Study on the Optimal Replacement Time of Physical Assets in Power Grid on the Basis of Grey Theory
SHENG Meng,ZHANG Shuya
Electric Power Construction . 2018, (6): 131 .  DOI: 10.3969/j.issn.1000-7229.2018.06.017